1. Top
  2. Elevator construction

Elevator construction

  • We are planning renovation work on the elevator next to the front desk from September 1st to September 15th, 2026.
    During this period, rooms on the side of the second elevator (non-smoking standard single room, non-smoking deluxe twin room, non-smoking triple room) will be available for purchase as usual.
    For rooms located next to the front desk, some room types (non-smoking compact single room, non-smoking standard twin room) are only available on the 4th and 5th floors.
    To reach this room, please take the second elevator to the 3rd floor, and then take the stairs to the 4th and 5th floors.
    The work is scheduled to take place from around 9:00 AM to around 5:00 PM.
    Additionally, we have plans to use cranes for work late at night on September 1st and 2nd.We will do our best to carry out the work while minimizing noise as much as possible.
    We apologize for any inconvenience this may cause during this period, and we appreciate your understanding.